UK & Europe's Premier Structural Solar Engineering Firm

Engineering Certainty.
Delivered in 48 Hours.

Eurocode-verified structural surveys, drone roof condition assessments and Desktop Structural Roof Loading Reports for commercial solar PV. Engineering Principals. 48-hour delivery benchmark. £5M PI. £25M Drone PL. UK, Ireland and Europe.

48h REPORT DELIVERY BENCHMARK
100% IN HOUSE STRUCTURAL ENGINEERS
UK & EU COVERAGE
100+ MONTHLY ON SITE SURVEY CAPACITY
£5M PROFESSIONAL INDEMNITY
£25M DRONE PUBLIC LIABILITY
BDF + BMFA ACCREDITED PILOTS
ENGINEERING PRINCIPALS 20+ YEARS

DEPLOYED ACROSS UK AND EU COMMERCIAL & B2B RESIDENTIAL SECTORS

  • LOGISTICS & WAREHOUSING
  • INDUSTRIAL MANUFACTURING
  • EDUCATION
  • SPORTS & RECREATION
  • PUBLIC SECTOR
  • HOSPITALITY
  • AUTOMOTIVE
  • COMMERCIAL REAL ESTATE
  • HOUSING & RESIDENTIAL PORTFOLIOS
  • BUILD-TO-RENT
  • SOCIAL HOUSING
  • AGRICULTURAL & RURAL ESTATES

WHY SOLAR SURVEYS

The Standard Every Serious Project Demands

48hr
Report Delivery
01

48-Hour Delivery Benchmark

Every commissioned report, from Desktop Structural Roof Loading Reports to full On-Site Structural Surveys and Drone Roof Condition Assessments, is delivered within 48 hours of instruction. No sub-contractor dependencies. No programme delays.

100+
Surveys per Month
On-Site Capacity
02

On-Site Capacity at Scale

Our engineering teams operate across the UK and Europe, delivering 100+ on-site surveys per month for high-velocity portfolios.

20yr+
Engineering Principals
Technical Experience
03

Engineering Principals Site-Side

Every site visit is conducted by Engineering Principals with over 20 years of technical structural experience. We capture building fabric integrity and structural risk factors with engineering rigour.

£25M
Drone Public Liability
BDF + BMFA Accredited Pilots
04

Drone Roof Condition Assessment

Our drone pilots are BDF + BMFA accredited and deploy high-resolution UAS equipment to capture substrate integrity, penetrations and drainage health, backed by £25M Drone Public Liability.

CERT.
Engineered for Compliance
Eurocode Verified
05

Engineered for Compliance

All reports are Eurocode-verified (BS EN 1991-1-4, BS EN 1991-1-3) and Building Regulations compliant. Engineer-signed documentation provides the structural evidence required by lenders, DNOs and planning authorities. For systems within MCS scope (sub-50kWp), reports also align to MIS 3002 V6.0 Section 5.9.

2,000+
Desktop Structural Roof Loading Reports per Month
High-Volume Pipeline Capacity
06

Batch Processing at Scale

Built for high-volume PPA pipelines and asset portfolios. Our proprietary technical suite allows us to deliver 2,000+ Desktop Structural Roof Loading Reports per month while maintaining a 48-hour staggered delivery benchmark.

SOCIAL PROOF

Trusted by the Professionals
Who Cannot Afford Delays

From PPA providers to national EPCs we support the pre-construction teams that run on engineering certainty.

Every Solar Surveys engagement is governed by strict client confidentiality. The testimonials below are reproduced with sector and scale descriptors only; client names, site addresses and project-identifying details are withheld in accordance with our standard confidentiality terms.

The Desktop Structural Roof Loading Reports come back within 24 hours more often than not. For a business running multiple deals simultaneously, that kind of turnaround is genuinely rare in this industry.
Commercial Director Independent Solar Finance House, Multi-Asset Portfolio Review
We had access restrictions on site and no way to get inspectors onto a fragile asbestos roof safely. The drone assessment came back with a full condition report and structural sign-off. Zero disruption to our operation.
Facilities Director Large-Scale Manufacturing Operator, 3-Site Assessment
Every structural report we received was produced to the standard required by lenders and approval bodies, no queries, no rework, no delays. That level of consistency is what you need when closing multiple transactions in the same quarter.
Director of Acquisitions Commercial Real Estate Fund, 6-Asset Portfolio
We had 20 school buildings to clear within a fixed programme window. Every site came back with consistent reporting and no structural interventions required. The entire rollout proceeded on schedule without a single delay.
Programme Lead Education Infrastructure Provider, 20-Site Portfolio
The drone assessment identified significant roof degradation that our desktop review had not caught. It directly prevented us from proceeding with an installation that would have required costly remediation mid-project.
Senior Project Manager National EPC Contractor, 4.2MW Array
We use their Desktop Structural Roof Loading Reports across our entire pipeline. The 48-hour turnaround holds even when we batch multiple sites in a single instruction. It has become a core part of how we run pre-construction diligence.
Head of Development UK Solar Asset Developer, Ongoing Pipeline Partnership

CASE STUDIES

Proven Engineering Outcomes

Real projects. Real results. Selected from across our active portfolio.

Every Solar Surveys engagement is governed by strict client confidentiality. The case studies below are presented with sector and scale descriptors only; client names, site addresses and project-identifying details are withheld in accordance with our standard confidentiality terms.

Industrial mega-site multi-building drone structural survey
LOGISTICS & WAREHOUSING

Industrial Mega-Site: 12-Roof Assessment

Twelve commercial and industrial roofs surveyed across a dense urban estate and confirmed structurally suitable for solar PV deployment under a single coordinated instruction. Drone roof condition assessment delivered across all twelve roofs simultaneously. No strengthening required across any structure.

12 Roofs Cleared Immediate Deployment Enabled
Legacy industrial manufacturing facility fragile roof structural assessment
INDUSTRIAL MANUFACTURING

Legacy Industrial Facility: Fragile Roof Assessment

Ageing asbestos-containing roof system assessed non-intrusively via drone. Structural sign-off issued with a clear remediation strategy and controlled installation methodology.

Asbestos Roof Cleared Safe Installation Strategy Defined
Major football stadium long-span roof structural and condition assessment for solar PV
SPORTS & RECREATION

Major Football Stadium: Long-Span Roof Survey

Long-span trapezoidal metal sheet roof assessed at height via drone. PV loading confirmed within allowable limits. Wind uplift strategy delivered using BRE Digest 489 methodology and Eurocode BS EN 1991-1-4 wind action provisions.

27m Height / Zero Strengthening Safe Installation Strategy Delivered
20+ schools assessed under coordinated programme: 15-tile aerial montage of school building roofs surveyed
EDUCATION PORTFOLIO

Schools Programme: 20+ Schools Assessed

Coordinated structural and roof condition assessments across 20+ school buildings under a single programme instruction. All sites delivered within programme timeframe. No major structural interventions required across the portfolio.

20+ Sites / On Programme Full Portfolio Cleared
CLASSIFIED
DEFENCE ESTATE

Defence Estate: 40+ Roof Programme

Multi-roof structural assessment delivered under strict NDA across a defence-tier asset portfolio. Survey programme executed within site security procedures. All structural appraisal outputs withheld under client confidentiality. Full programme clearance issued without operational disruption.

40+ Roofs / Classified Programme Confidentiality Maintained Throughout
Educational campus multi-roof solar feasibility structural assessment
EDUCATION CAMPUS

Educational Campus: 6-Roof Solar Assessment

A live college campus with six distinct roof areas needed structural and condition clearance before installation could begin. Standing seam roofs confirmed as immediately installation-ready. Flat roof areas given a pre-installation maintenance strategy, enabling the programme to proceed in phases.

6 Roofs Classified Install-Ready vs Remediate-First
CLASSIFIED
HIGH-SECURITY ESTATE

Classified Site: 50+ Building Assessment

Large-scale programme delivered under strict confidentiality and controlled access protocols. Majority of buildings confirmed suitable for solar PV. Full portfolio clearance achieved without operational disruption.

50+ Buildings Cleared Confidentiality Maintained Throughout
National timber and industrial portfolio multi-site structural survey
NATIONAL INDUSTRIAL PORTFOLIO

Timber and Industrial Portfolio: Multi-Site

Drone-led structural and roof condition surveys delivered across multiple sites in a national industrial portfolio. Roof systems across all sites confirmed in good to excellent condition. No strengthening required, full installation clearance issued across the portfolio.

Multiple Sites Cleared Consistent Reporting Across All Locations
Mixed domestic and commercial education portfolio structural assessment
EDUCATION PORTFOLIO

Mixed Education Portfolio: Domestic and Commercial

A mixed portfolio of domestic-style and commercial school buildings assessed within a single coordinated programme. Both construction types confirmed structurally viable. Tailored installation guidance produced for each roof type, allowing the client to proceed directly to design.

Programme Schedule Met Mixed Construction Types Cleared

FREE 42-PAGE REPORT

1 in 3 UK Commercial Roofs Need Engineering Work Before Solar PV

An analysis of 575 UK commercial rooftops surveyed for solar PV structural feasibility between 2024 and 2026. The 35% intervention rate, the 78% ballast reconfiguration rate, and the snow load plus altitude bias finding unique to UK commercial geography. Anchored to MIS 3002 V6.0, mandatory 18 June 2026.

Download The Report

FAQ

Common Questions

What is included in an on-site structural survey?

Our on-site structural surveys are conducted by qualified structural engineers on every visit, not general surveyors. The engagement includes a full structural assessment of load-bearing elements, building fabric and structural risk factors, combined with a drone roof condition assessment covering surface integrity, defects, penetrations and panel suitability. Both are delivered in a single instruction with a combined report accepted by lenders, local planning authorities and DNOs.

How does a Desktop Structural Roof Loading Report work?

Desktop Structural Roof Loading Reports are remote structural assessments based on site data, roof geometry and load calculations. We verify dead loads, snow loading, wind uplift and imposed load against Eurocodes and BS standards, producing a pass/conditional/fail determination for each structure. Each report is produced by a qualified structural engineer and delivered to our standard 48-hour benchmark. We handle 2,000+ Desktop Structural Roof Loading Reports per month at full throughput.

What is a drone roof condition assessment?

A drone roof condition assessment uses aerial inspection to capture high-resolution visual evidence of roof surface integrity, structural defects, penetrations, drainage condition and panel suitability, without requiring physical access. This is particularly valuable for fragile, asbestos-containing or restricted-access roofs where foot traffic is prohibited. The assessment is delivered alongside the structural report as a single combined output.

How quickly can you mobilise for a site survey?

We target mobilisation of a qualified structural engineer to site within 24 hours of instruction for priority assessments, deploying from regional hubs across the UK. Structural survey reports are then delivered within 48 hours of the site visit completion. For Desktop Structural Roof Loading Reports, the 48-hour delivery benchmark runs from receipt of all required client information with no site visit required.

What areas do you cover?

Solar Surveys operates across England, Scotland, Wales, Northern Ireland and Europe. Our on-site survey teams deploy nationally with priority scheduling. Our Desktop Structural Roof Loading Report service has no geographic restriction within these regions.

Can you handle high-volume Desktop Structural Roof Loading Report programmes?

Yes. Our desktop assessment workflow is built for throughput. We deliver more than 2,000 reports per month at full capacity, with programmes scale-managed to maintain our standard 48-hour delivery benchmark. We support PPA providers, asset managers and solar developers running batch pipelines, with consistent velocity maintained even at high volume. Multiple clients can be supported simultaneously without bottleneck.

What standards do your structural reports satisfy?

Our reports apply the current UK Eurocode suite: BS EN 1990 (load combination basis), BS EN 1991-1-4 with UK National Annex (wind actions, replacing the withdrawn BS 6399-2:1997), BS EN 1991-1-3 with UK National Annex (snow loads), and BRE Digest 489 (2014) for PV-specific wind pressure coefficients. Reports are produced to satisfy Building Regulations (Approved Document A in England & Wales, Section 1 Structure in Scotland, Technical Booklet D in NI) and are accepted by lenders, DNOs and planning authorities for systems of any size. For solar PV systems within MCS scope (sub-50kWp DC output), our reports additionally satisfy MIS 3002 V6.0 Section 5.9 for MCS-licensed installer submissions.

Engineering Certainty.
Delivered in 48 Hours.

Commission a report today and unblock pre-construction pipelines with the independent structural engineering partner built for high-velocity portfolios.

Get a Quote

DEPLOYMENT NETWORK

Regional Hubs and
Global Deployment

We maintain an industrial scale mobile engineering force capable of rapid deployment throughout the UK and Europe. Our strategic hubs ensure 48 hour turnaround times for major commercial portfolios.

5 REGIONAL HUBS
48h TURNAROUND
UK+EU COVERAGE
SCOTLAND Glasgow Head Office  ·  Edinburgh  ·  Aberdeen
NORTHERN ENGLAND Manchester  ·  Leeds  ·  Liverpool  ·  Newcastle
THE MIDLANDS Birmingham  ·  Nottingham  ·  Leicester
SOUTHERN ENGLAND London  ·  Reading  ·  Bristol  ·  Southampton
INTERNATIONAL Lyon  ·  Munich  ·  Zurich  ·  Milan  ·  Barcelona
GLOSSARY
LOCATIONS