Roof Strengthening Design for Solar PV

When a structural appraisal shows that a roof cannot carry a solar PV array, or a new roof covering, as it stands, we design the strengthening: additional or upgraded purlins, sleeved or doubled members, bracing, upgraded connections and cleats, and local reinforcement of steel or timber members. You receive calculations and drawings a contractor can price and build from. From £1,250, with a quote within 24 hours.

Steel portal frame, purlins and fibre cement roof sheets seen from inside an industrial building
£1,250Strengthening design from
24hrTarget for quotes
UK + IECoverage
£5MProfessional Indemnity
£5M PROFESSIONAL INDEMNITY
BDF + BMFA ACCREDITED PILOTS
EUROCODE VERIFIED
ENGINEERING PRINCIPALS 20+ YEARS
ACE & EIC MEMBER

What is roof strengthening design for solar PV?

Roof strengthening design is the structural design of alterations that let an existing roof carry a solar PV array, or a new roof covering, together with the loads it already supports, where an appraisal has shown that it cannot do so as built. Solar Surveys designs the strengthening for steel and timber roofs, with calculations to BS EN 1993 (steel) or BS EN 1995 (timber) and the UK or Irish National Annex, and drawings a contractor can price and build from. The engineers who surveyed the building design the works, answer queries during construction and can inspect the finished work.

  • Who it is for: solar installers and EPC contractors, roofing and cladding contractors, building owners, asset and facilities managers, and farm and estate owners whose roof needs work before the panels go on.
  • What you receive: calculations and construction drawings for the strengthening: member sizes, connection details and fixings, with the sequence of work where it matters, signed by a qualified structural engineer. Chartered engineer sign-off is available where a scheme, lender or client requires it.
  • Standards: BS EN 1990 and BS EN 1991 with the UK National Annexes; BS EN 1993 for steel, including Part 1-3 for cold formed purlins and Part 1-8 for joints; BS EN 1995 for timber; BRE Digest 489 for PV wind uplift; I.S. EN Eurocodes with the Irish National Annexes for sites in the Republic of Ireland.
  • Turnaround: quotes to a 24-hour target; the design programme is agreed at quote, depending on the size of the roof and whether a survey is needed first.
  • Price: from £1,250 per building.
  • Insurance: £5M professional indemnity.
  • Coverage: England, Scotland, Wales, Northern Ireland and the Republic of Ireland.

WHEN IT IS NEEDED

When strengthening is needed

Strengthening comes after an appraisal finds a shortfall. On roofs for solar PV, the shortfall usually sits in one of a small number of places: the permanent load of the modules, rails and, on flat roofs, ballast; snow, including drift against rows, parapets and upstands; wind uplift, which can reverse the stresses in light members such as purlins; or the connections, where the members have spare capacity but the joints and fixings do not.

Older buildings add their own causes. Corrosion at purlin cleats, bearings and frame connections is common, and earlier alterations, such as plant hung from purlins or openings cut through the roof, change how load reaches the frame. In our published UK Roof Plane Dataset 2026, a visible condition issue was photographed on 83% of fibre cement roofs.

A shortfall in a first, conservative calculation is not always a reason to strengthen. Replacing assumptions with measured member sizes, spans and the actual weight of the covering often closes the gap, and that check comes before any strengthening is designed.

COMMON TRIGGERS

  • Purlins short of capacity under PV uplift or snow drift
  • Connections and cleats weaker than the members they join
  • Corrosion or decay at bearings and joints
  • Earlier alterations that changed the load path
  • A heavier roof covering, such as an overclad, plus PV

TYPICAL MEASURES

What strengthening usually involves

Steel portal frames and trusses

Additional purlins to shorten spans or spacing, sleeves or sections bolted to existing members, sag bars, struts or bracing against lateral torsional buckling under uplift, and new cleats or additional bolts at connections. Bolted additions avoid hot work over the roof and do not depend on the weldability of steel of unknown grade.

Timber pitched roofs

Sistering a new member alongside an existing rafter or purlin, adding rafters or purlins to shorten spans, strutting purlins down to loadbearing walls where the structure below can take it, and upgrading connections and straps against uplift. Trussed rafters are treated as engineered units, so any change to them is designed.

Flat roofs

Rails or spreader members that carry ballast loads onto primary beams or walls rather than the deck between them, placing the array over stronger zones, or additional members below the deck. Ponding is checked, because deflection under the extra load can draw in water and add load of its own.

HOW IT WORKS

From appraisal to sign off

One team carries the job from the first check to the inspection of the finished work.

1. SURVEY OR DESKTOP REVIEW

We establish the structure as built: member sizes, spans, spacings, connections and condition, from a site survey, a drone roof condition survey, or a desktop review of existing drawings and photographs where they are good enough.

2. OPTIONS

Before strengthening is designed, we check whether a refined appraisal, a lighter array, reduced coverage away from edges and corners, or a different mounting would avoid it. Where strengthening is the right answer, we set out the scope.

3. DESIGN

Calculations and construction drawings for the strengthening: member sizes, connection details, fixings and the sequence of work where it matters, ready for the contractor to price and build, and for building control where approval is needed.

4. CONSTRUCTION QUERIES

We answer the contractor's technical queries during the works, including site variations where the structure found differs from the structure surveyed.

5. INSPECTION

We can inspect the finished strengthening and confirm it in writing, so the roof can be signed off for the array.

WHAT WE NEED TO QUOTE

The site address; photographs of the roof and of the frame inside; any drawings, previous surveys or structural reports; the PV layout and mounting system; and the asbestos survey if the roof is asbestos cement. We aim to return a quote within 24 hours.

Send the details →

COMPLIANCE FRAMEWORK

Checked to the Eurocodes.
Engineer Signed.

Strengthening is designed to the structural Eurocodes with the National Annexes for the country the building is in, and with regard to the building regulations that apply there. Each design states the loads used, the members and connections checked and the result, and is signed by a qualified structural engineer.

How we assess a roof →

STANDARDS APPLIED

  • BS EN 1990 and BS EN 1991: basis of design, snow and wind, with the UK National Annexes
  • BS EN 1993: steel members, cold formed purlins (Part 1-3) and joints (Part 1-8)
  • BS EN 1995: timber members and connections
  • BRE Digest 489: wind loads on roof-mounted photovoltaic systems
  • I.S. EN Eurocodes with the Irish National Annexes for sites in the Republic of Ireland

FREQUENTLY ASKED QUESTIONS

Questions we are asked about roof strengthening

How much does roof strengthening design cost?+

Strengthening design starts from £1,250 for a single building. The price depends on the size of the roof, the number of members to be strengthened and whether a survey is needed first. Send photographs of the roof and of the frame inside, any drawings and the PV layout, and we aim to return a quote within 24 hours.

Do I need a structural survey before strengthening is designed?+

Usually, yes. Strengthening is designed for the structure as built, so we need measured member sizes, spans, spacings and connection details. If a recent survey or one of our desktop reports already records these, the design can start from it. Otherwise we survey the roof first, often with a drone roof condition survey on the same visit. A refined appraisal sometimes shows that the roof can carry the array without any strengthening.

Can you design strengthening for an asbestos cement roof?+

Yes, for the structure. We design the strengthening of the frame, purlins and connections beneath asbestos cement or fibre cement sheets, and record the sheets from the air or from safe access. We do not sample, disturb or remove asbestos. That stays with licensed asbestos contractors, working in Great Britain to the Control of Asbestos Regulations 2012.

Does roof strengthening need building regulations approval or a building warrant?+

It depends on the nation and the scope of the work, and the decision rests with building control. In England, Approved Document A treats an increase in roof loading of more than 15% as significant and classes the strengthening needed to carry it as a material alteration, so notice is normally given to a building control body before work starts. In Scotland a building warrant is normally needed unless the work is exempt. Wales, Northern Ireland and the Republic of Ireland apply their own regulations. Our calculations and drawings are prepared so that they can go with the application.

How long does strengthening design take?+

The programme depends on the size of the roof, the number of members involved and whether a survey is needed first, and it is agreed when we quote. We aim to return a quote within 24 hours of receiving the photographs, drawings and PV layout.

Can the solar panels go on in the same programme as the strengthening?+

Yes. The strengthening is designed around the PV layout and its fixing zones, so the works and the installation can be sequenced together. We answer the contractor's queries during construction and can inspect the finished works before the array goes on.

RELATED SERVICES

Often instructed together

On-site structural surveys →

The measured survey that strengthening is designed from.

Roof refurbishment and overcladding →

Appraisal and design when the roof covering is replaced or overclad, with or without solar PV.

Solar PV on asbestos cement roofs →

Structural surveys of fragile asbestos cement and fibre cement roofs.

TAMS reroofing engineer’s report →

The S101R report for farm buildings in Ireland where stanchions or rafters are kept.

Desktop structural roof loading reports →

A remote check of whether a roof can carry the array before strengthening is considered.

Drone roof surveys →

The condition of the whole roof recorded from the air, with nobody on the sheets.

COMMISSION A DESIGN

Ready to Proceed?

Send us the site address, photographs of the roof and of the frame inside, any drawings and the PV layout. We aim to confirm scope and return a quote within 24 hours.

GLOSSARY
LOCATIONS