Installer Pre-Brief Checklist
One image, one quote, fast.
Send the roof boundary image or your PV design file and we can issue a fee proposal within 24 to 48 hours. Mounting and panel info strengthens the report but can follow before or after the site visit.
Download 1-Page PDFRoof boundary image or PV design file
Either option carries the same weight. Send whichever you have ready and we can quote.
Not required to issue a quote. Tell us the brand and model and we can take it from there. Full datasheets add depth to the report and can follow before or after the site visit.
Mounting system brand and model
At minimum, tell us the mounting manufacturer and model (for example, Schletter Fix-EX, SL Rack Trapez 3, S-5! ProteaBracket). The full manufacturer datasheet with uplift, static, snow load values, and fixing method strengthens the report. Can be sent before or after the site visit.
Panel make and model
At minimum, tell us the panel manufacturer and model number (for example, JA Solar JAM72S30-545/MR, Longi Hi-MO 6 555W). The full panel datasheet with dimensions, weight, glass thickness, and frame profile strengthens the report. Can be sent before or after the site visit.
Helpful, not required
The items below are not mandatory. Where available they sharpen the report and reduce the engineering assumptions we have to make. If you have none of them, that is fine: we work to the brief you provide.
From brief to engineer-signed report
Same-day acknowledgement
Receipt confirmed, any missing items flagged.
Fee proposal 24 to 48 hours
Fixed fee under ACE Professional Services Agreement 2017.
Site visit on instruction
Surveyor from the UK hub network scheduled within the week.
Report 48 hours from site visit
Engineer-signed, Eurocode-anchored, issued with invoice.
Send the three documents to contact@solarsurveys.co.uk.