How it works
Postcode plus three roof inputs. Server-side engine matches your postcode to a snow zone, applies altitude correction, calculates the combined design load against indicative capacity, returns Green, Amber, or Red.
- Postcode → snow zone + altitude
- Roof type → shape coefficient
- Material → dead load
- Combined ULS load check
- Verdict band returned
Email-gated before the result. Verdict shown on screen and emailed to the address you provide.
Standards applied
- BS EN 1991-1-3 + UK NA (snow)
- BS EN 1991-1-4 + UK NA (wind)
- BS EN 1991-1-1 Annex A (dead loads)
- BS EN 1990 (load combinations)
- MIS 3002 V6.0 §5.5.5(b)
- BRE Digest 489 (PV-specific)
Same Eurocode anchor for MCS-licensed (sub-50kWp) and commercial portfolio assessments.
Top three questions
Is this enough? No. Indicative only. The documented assessment is what installers, insurers, lenders, and building control require.
Commercial or MCS? Both. Same screening, same standards, same routing.
What do I receive? Verdict on screen and emailed to the address you provide.
Full FAQ section below.
Whatever the screening result, the documented structural assessment is the deliverable.
Fixed-fee. Quote within 24 hours of enquiry. Delivered within 48 hours from confirmed scope. Qualified structural engineer sign-off. For MCS-licensed installations under MIS 3002 V6.0 and for commercial portfolios under PPA finance / Technical Advisor / insurer review.
WHY COMMISSION THE DOCUMENTED ASSESSMENT
For MCS-licensed installations, the documented structural assessment is mandatory from 18 June 2026. For commercial portfolios, it unlocks PPA finance, lender Technical Advisor sign-off, and insurer cover. The pre-check tool is the funnel. The documented assessment is what closes the deal.
Solar Surveys · Engineering Editorial
WHO USES THIS TOOL
Equal weight: commercial and MCS-licensed.
Asset managers and PPA developers
Portfolio screening at scale. Pre-due-diligence on candidate sites before commissioning documented assessments. Unlocks PPA finance and Technical Advisor sign-off.
EPC and construction contractors
Early-stage feasibility filtering on solar tender opportunities. Triages which sites warrant full documented assessment before bid pricing locks.
MCS-licensed installers
Pre-screening sites before quoting. Triages which projects need documented structural assessment under MIS 3002 V6.0 Section 5.5.5(b), mandatory from 18 June 2026.
Commercial occupiers and homeowners
Understanding structural feasibility on your roof. Indicative screening signed off by Solar Surveys — useful before quoting installers, lenders, or insurers.
WHAT YOU GET WHEN YOU COMMISSION
The documented structural assessment.
Six deliverables in the documented assessment package. Single fixed fee. Quote within 24 hours of enquiry. Delivered within 48 hours from confirmed scope.
Eurocode load calculation
Site-specific snow, wind, dead load, and PV load combined per BS EN 1990 ULS. Numerical capacity check against the actual roof structure.
Drift and exposure analysis
Site-specific drift geometry at the panel array. Exposure factor calculated for your roof, not a generic terrain category.
Existing roof condition statement
Roof structure condition, fixings, and known defects assessed. Foundation transfer and load path continuity verified.
MIS 3002 V6.0 evidence
Compliance evidence under Section 5.5.5(b) for MCS-licensed installations. Equivalent compliance under commercial / PPA / TA review requirements.
Qualified structural engineer sign-off
Signed by a qualified structural engineer. £5M Professional Indemnity cover. Independent qualified structural sign-off.
48-hour turnaround. Fixed fee.
Quote within 24 hours of enquiry. Delivered within 48 hours from confirmed scope. Single fixed fee. No hourly creep. Forward-ready for installers, insurers, lenders, and building control.
Commission the documented assessment now.
Get a quote within 24 hours. No commitment. Free to ask.
FREQUENTLY ASKED QUESTIONS
Pre-Check Questions.
What does the screening result mean?
Is this screening enough to satisfy MIS 3002 V6.0 for MCS-licensed installations?
Can commercial portfolio buyers use this?
How is the screening different from the documented structural assessment?
What standards does the screening use?
What do I receive from the screening?
When is the documented structural assessment essential?
How long is the screening result valid?
What happens to my data?
Commission the documented structural assessment.
Fixed fee. Quote within 24 hours of enquiry. Delivered within 48 hours from confirmed scope. Qualified structural engineer sign-off. Forward-ready for installers, insurers, lenders, building control, and asset-portfolio audits.