Author

Sahir Raihan

Managing Director · Solar Surveys Ltd

Leads the engineering team at Solar Surveys Ltd, a structural engineering practice working exclusively on commercial solar PV. Author of the PV Structural Feasibility Dataset 2026 and of the Structural Feasibility Assessment Specification, and the named contact on the survey and reporting work behind both.

What he is responsible for

Solar Surveys assesses existing roofs proposed to carry solar PV, and issues the structural report that a client, a funder or an insurer relies on. Sahir leads the engineering team that does that work, and sets the standard the practice holds itself to.

That standard is stricter than the regulation requires, deliberately. MIS 3002 V6.0 mandates a qualified structural engineer in named cases — unusual roofs under 5.9.6, every flat roof ballasted system under 5.9.13(h) without exception, and non-standard mounting under 5.5.5(b). Outside those cases the universal 5.9.4 check may be made by a suitably competent person. Solar Surveys applies the engineer standard to all commercial work, and is clear about which part of that is the regulation and which part is ours. That position is set out in full in the Assessment Specification.

Published work

14 Aug 2026

Structural Feasibility Assessment Specification, Issue 1
An open specification for what a structural feasibility assessment must contain. Free to adopt and quote into a scope of works. Certifies nobody.

14 Aug 2026

PV Structural Feasibility Dataset 2026
Aggregate findings from 575 UK commercial rooftop assessments carried out between 2024 and 2026. Published openly, with the method stated and no registration.

Ongoing

Technical articles
Standards, roof substrates, loading and compliance for commercial rooftop PV.

Independent coverage

Quoted or bylined in the insurance, construction and energy trade press. Each of these is the publisher's own page, and none of it is reproduced here.

Insurance Times

Quoted throughout “A third of commercial rooftops unfit for solar without remedial work”, 4 August 2026, which draws on the 575-survey dataset.

PBC Today

Bylined author of “Mind the gap: the structural blind spot in the new rooftop solar mandate”, 15 July 2026.

The Energyst

Contributed analysis, “Who is allowed to sign off your roof? The gap in the new solar mandate”, 12 June 2026.

All three are listed with direct links in the newsroom.

Verify independently

Nothing on this page asks to be taken on trust. Both records below are public and neither is controlled by us.

Press enquiries and technical questions: contact@solarsurveys.co.uk or +44 141 628 9009.