G98 Application

The G98 application is essential for registering small-scale embedded generation systems, such as solar PV installations, with the local Distribution Network Operator (DNO). This application is specifically for microgeneration systems with a capacity of up to 16 amps per phase (3.68 kW per phase). Our team expertly navigates the G98 application process, ensuring full compliance with Engineering Recommendation G98 standards. We manage the preparation of all required documentation, including details on system type, capacity, inverter specifications, and installer information. We oversee the approval process, which typically spans up to 8 weeks, and ensure prompt notification to the DNO within 28 days of commissioning, guaranteeing a smooth and efficient integration of your system.